Skip to content

Synergy Adjustable Bed – Twin XL, Queen, King & Split Head Sizes | Customatic DreamSense

  • Available in Twin XL, Queen, Split Head Queen, King, and Split Head King sizes
  • Split Controls Available – With the Split Head Queen and Split Head King bed, each person controls their own head and foot positioning independently
  • Choice of Mattress – DreamSense Bliss Hybrid 12" Plush (available in all sizes) or DreamTemp 13" Plush or Firm (Twin XL, Full, Queen only)
  • Built-In Massage & USB Charging – Relaxation features plus dual USB ports (USB-A + USB-C) for device charging
  • Adjustable 2"-13" Height – 3-in-1 stacking legs provide 7 different height options for any bedroom setup
  • Optional Hi-Low Upgrade Available – Convert to full electric hi-low adjustable bed with 8" height lift and up to 10 degrees tilt adjustment for both head and foot (Twin XL and Queen models)
  • Note: Main image is the Synergy Split Queen Adjustable Bed with the DreamSense Bliss Hybrid Mattress
  • Save Over > 10% For Bulk Orders - Call 833-499-4450 (Need Tax Exemption? Call Now)
$729.00
$729.00 - $729.00
Current price $729.00
Original price $729.00 - Original price $729.00
Original price
people have this in their cart

HSA/FSA eligible Learn more

Shipping

FREE GROUND SHIPPING

  • Ships to: Lower 48 contiguous states in the United States
  • Ships via: FedEx, UPS, or Motor Freight
  • Standard 5-8 Day Shipping
  • All orders after 3pm CST will be processed the following day

Once your order is placed, we will pre-authorize your credit card and you should receive a confirmation that your item has shipped within 5-8 business days with a tracking number. In the event there will be a delay we will reach out to you with a timeline. If you do not hear from us within that time please email us at support@medshopdirect.com

Please view the states we ship Free to:
Maine, New Hampshire, Vermont, Massachusetts, Rhode Island, Connecticut, New York, Pennsylvania, New Jersey, Delaware, Maryland, Virginia, West Virginia, North Carolina, South Carolina, Georgia, Florida, Alabama, Mississippi, Tennessee, Kentucky, Ohio, Indiana, Illinois, Michigan, Wisconsin, Minnesota, Iowa, Missouri, North Dakota, South Dakota, Nebraska, Kansas, Montana, Wyoming, Colorado, New Mexico, Washington, Oregon, California, Nevada, Utah, Idaho, Arizona, Oklahoma, Texas, Arkansas, Louisiana.


Currently we do not export internationally nor fulfill orders outside of the
mentioned 48 states.

Returns

Return And Refund Policy

MedShop Direct — Return & Refund Policy
Last updated: [7/3/2025]

Thank you for shopping with MedShop Direct. We want you to be completely informed about how returns and refunds are handled. Due to the specialized nature of medical equipment, strict hygiene standards, and manufacturer requirements, we maintain clear policies to protect all customers. READ CAREFULLY: Scroll down to read the Manufacturer Return Policy that pretains to your order. 

RETURN REQUEST TIMEFRAME

We provide a 30 days return window. You must submit your return request within 7 calendar days of receiving your order. Requests made after this period will not be eligible for return.

Once your return is approved and a Return Merchandise Authorization (RMA) is issued, the item must be received back to the address provided within 30 days. Returns received after this timeframe may be refused.

You must contact us first to obtain a Return Merchandise Authorization (RMA) at support@medshopdirect.com or 833-499-4450.

Returns sent without an authorized RMA will be refused and no refund will be issued.

DELIVERY ACCEPTANCE

Once a product has been delivered and accepted at the specified delivery address, the sale is considered final regardless of who accepted delivery at that location. Customers are responsible for:

  • Being available at delivery or ensuring authorized recipients are present
  • Coordinating with all parties at the delivery location prior to delivery
  • Any delivery accepted by anyone at the delivery address

Products delivered to addresses provided by the customer, or accepted by any person at the delivery location, are considered successfully delivered and are subject to standard return restrictions per manufacturer and company policy.

ELIGIBILITY & CONDITION REQUIREMENTS

To qualify for a return:

The item must be new, unused, unassembled, and in original packaging, with all original parts, manuals, tags, and accessories intact.

Indications of use include, but are not limited to: scratches, cracks, dirt, pet hair, odors, signs of installation, wear to cushions, rails, or fabric, or missing accessories.

Any item that has been installed, assembled, used, modified, or damaged is not eligible for return and will be refused.

Custom-built or special-order items are final sale and non-returnable once production has begun.

RETURN PROCESS

Request an RMA within your 7-day window by emailing support@medshopdirect.com or calling 833-499-4450. Include your order number, name, and the item you wish to return.

Once an RMA is issued, you must ship the item to the address provided within 14 days. Returns received after that timeframe may be refused.

Returned products will be inspected for damage and signs of use. If an item shows any signs of use or damage, no refund will be issued. If your item is not eligible for return after inspection, we will contact you. You will be responsible for return shipping if you want it shipped back to you.

DAMAGED OR DEFECTIVE PRODUCTS

Please inspect your product carefully upon delivery. If the item is visibly damaged or the wrong item was sent, please refuse delivery with the carrier whenever possible.

If your item was delivered without a signature and you discover it is damaged or incorrect, notify us within 3 days at support@medshopdirect.com or 833-499-4450 so we can help you arrange for a prompt replacement or repair if eligible under the manufacturer's warranty.

For Truck Freight and White Glove Deliveries:

  • When signing for delivery, note "Package Damaged" on delivery receipt if package appears damaged, even slightly
  • If package appears significantly damaged, you may refuse delivery - notify us immediately so we can expect the return shipment
  • If you accepted delivery and later discover missing or damaged parts, contact us immediately for free replacement parts (we typically have only a 48-hour window to file freight claims)
  • If we cannot replace parts, our carrier will pick up the original package and send a full replacement

Products reported as damaged or defective after the 3-day inspection period may not be eligible for replacement.

If damage is verified and covered by the manufacturer's warranty, we will work with you to arrange for the product to be repaired or replaced at no charge.

Damage due to misuse, neglect, improper handling, or unauthorized modifications is not covered and may void your warranty.

RETURN SHIPPING & COSTS

Return shipping is your responsibility. We strongly recommend using a trackable, insured method.

If your order included "free shipping," our original outbound shipping cost will be deducted from your refund.

If we arrange a prepaid return label at your request, that cost will also be deducted from your refund.

Outgoing freight and delivery service fees (Next-Day, Overnight, White Glove Delivery, or Tech Set-Up) are not refundable.

Missed scheduled carrier pickups may incur a minimum $75 fee per missed attempt, or the actual carrier charge, whichever is greater.

RESTOCKING FEES

All approved returns are subject to a minimum 30% restocking fee. Some manufacturers may charge higher restocking fees in line with their policies.

Higher Restocking Fees are in place for these specific Manufacturers/Vendors:

  • Graham-Field (GF) - Restocking Fee is 35% if the product is returnable. If the manufacturer does not authorize the return, the item is non-returnable and no refund will be issued.

Restocking fees cover inspection, processing, and repackaging costs.

UNAUTHORIZED RETURNS

Returns sent without an authorized RMA number will not be accepted or refunded.

If an unauthorized return is received, you must pay for return shipping back to you within 3 days or the item will be disposed of without credit.

HOSPITAL BEDS AND MATTRESSES

All hospital beds are exempt from return upon delivery due to hygienic reasons and manufacturer policies. Mattresses, mattress overlays, and bed foundations that have shipping damage upon delivery are eligible for repair or replacement - contact us immediately at support@medshopdirect.com or 833-499-4450. Defects reported after 72 hours of delivery will be covered under the manufacturer's warranty terms.

PARTS AND ACCESSORIES

Under no circumstances do we accept returns of parts that have been installed, assembled, or used. Verify compatibility prior to installation and use. Returns showing evidence of installation or use will be rejected with no credit issued, and return shipping costs will be charged to the customer.

Batteries are considered consumable parts and are not returnable for any reason. If your battery arrives damaged or has a manufacturer defect, we will replace it with the same specifications as ordered.

Authorized returned electrical items (such as controllers and control modules) may be tested for functionality before credits are issued.

For parts compatibility assistance, call 833-499-4450 with your unit's serial number. We can only provide parts support for products originally purchased from MedShop Direct.

EXCEPTIONS — NON-RETURNABLE PRODUCTS

Products Under $25 Are Non-Returnable:

MedShop Direct does not accept returns on items that cost less than $25. We have implemented this policy because the costs associated with processing returns on low-price items exceed the item value for all parties involved.

Products manufactured by these Vendors are Non-Returnable:

  • Accessibility Professionals (ACC) will not accept product returns
  • Access-Able (AA) does not accept product returns
  • Air Hawk (AIRH) does not accept product returns
  • Aqua Swivel (AQS) does not accept product returns
  • Bemis Independence (BEM) does not accept product returns
  • BLZ Technology Co, Ltd (BLZ) does not accept product returns
  • Intensive Therapeutics Inc (ITI) does not accept product returns
  • jFit (JFT) does not accept any product returns
  • HealthPedal (HEP) does not accept product returns
  • Kyrios Suit (KYR) does not accept product returns
  • LIFE Corporation (LFC) does not accept product returns
  • Mackworth USA (MAC) does not accept product returns
  • MedaCure (MCR) does not accept product returns
  • Meditrac (MTR) does not accept product returns
  • MJM International (MJM) does not accept product returns
  • MOBB Health Care (MOB) does not accept product returns
  • Precision Medical (PM) does not accept returns after the product package has been opened
  • RCAI - Restorative Care of America (RC) will not accept returns if the package has been opened
  • Responsive Respiratory (RRI) does not accept any product returns
  • Skil-Care (SKC) does not accept returns, due to the products being hygiene oriented single patient use products
  • The Independence Beds / Customatic Technologies (IND) does not accept product returns
  • Trionic (TNC) does not accept returns on any items
  • Tivasol (TIVI) does not accept returns on any items
  • Infinium Medical Products

    Orders may be canceled or changed only with Supplier's written consent. No Deliverable may be returned without a Returned Merchandise Authorization (RMA) number issued by Supplier. Authorized non-warranty returns are subject to a minimum 25% restocking fee and must be in full case quantities, unexpired, in original unopened packaging, and saleable condition. Discontinued or custom products are non-returnable. Purchaser bears all return-freight costs. Credit for authorized returns will be issued only after Supplier's inspection and acceptance of returned goods.

Product Categories that are Non-Returnable:

  • Accessories/Parts/Replacement-Parts - (cannot be returned - special order item)
  • Custom Ordered Ramps - (cannot be returned - special order item)
  • Anything open, used, or tried-on - (cannot be returned)
  • Hygiene products / toileting products / bathroom products / body braces / foam cushions / wheelchair cushions / stockings / splints - Products that come in contact with the human body cannot be returned as they are single-use patient items per cross-contamination laws
  • Bed Mattresses, Low Air Loss & Alternating Pressure Mattresses - (cannot be returned - special order item)
  • CPAP machines / BIPAP machines - (cannot be returned)
  • Custom Wheelchairs - (cannot be returned - special order item)
  • Custom Strollers - (cannot be returned - special order item)
  • Hospital Beds - (cannot be returned - special order item)
  • Hoyer Lifts - (cannot be returned - special order item)
  • Lift Chairs - (cannot be returned - special order item)
  • Open Box Items - (cannot be returned as they are discounted and designated as final sale items)
  • Overlay Mattresses - (cannot be returned - due to hygiene laws)
  • Oxygen Concentrators - (cannot be returned - special order item)
  • Patient Lifts - (cannot be returned - special order item)
  • Raised Toilet Seats and Commodes - (cannot be returned - due to hygiene laws)
  • Shower Chairs and Bath Seats - (cannot be returned - due to hygiene laws)
  • Scooters - (cannot be returned - special order item)
  • Clinical furniture items - (cannot be returned - special order products)

Certain products are custom-built, special-order, or final sale per manufacturer policy and are non-returnable once an order is placed or production has begun. Examples include but are not limited to:

Fully electric or custom-configured hospital beds

Transfer Master branded products (all Transfer Master beds and accessories are final sale)

Bariatric or specialty beds with non-standard sizing

Adjustable or custom lift chairs with upgraded fabrics, heat and massage, PowerPillow, extended footrests, or non-standard controls

Icare branded products (all Icare beds and accessories are final sale)

Certain scooters, power chairs, and patient lifts with custom add-ons

Stairlifts, vehicle lifts, or other installation-based equipment

Parts that have been installed, assembled, or used

For hygiene and patient safety reasons, the following products are non-returnable once opened, even if unused:

Bath safety equipment (e.g., commodes, grab bars, shower chairs)

Mattresses, mattress overlays, or bed cushions

Slings, patient transfer aids, or other body-contact lifting devices

Seating products, support cushions, and backs

Any product that comes into direct contact with skin, bedding, or bodily fluids

Returned products that are eligible for refund are subject to a minimum 30% restocking fee. Restocking fees may be higher (up to 50%) for certain manufacturers or special-order items. Items that commonly carry restocking fees include but are not limited to:

Hospital beds and related bed parts

Lift chairs

Scooters and power wheelchairs

Standard manual wheelchairs (excluding custom-built, which are non-returnable)

Rehab shower commode chairs

Parts and accessories

REFUND TIMELINE

Refunds will be processed only after the item is received, inspected, and approved.

Please allow up to 14–30 business days from receipt for inspection and refund processing.

Refunds may take 1–2 billing cycles to appear on your credit card statement.

Refunds will be issued minus the restocking fee, our original shipping cost (if your order included free shipping), any prepaid return shipping costs, and payment processor fees (typically 2.9% + $0.30).

CANCELLATIONS

Orders may be cancelled within 8 hours of placing the order, provided the order has not already entered fulfillment.

After the initial 8-hour window, your order is considered in fulfillment and may be subject to a 30% cancellation fee if cancellation is still possible.

Transfer Master beds, hospital beds, and other custom medical equipment cannot be cancelled once production has begun per manufacturer policy.

Once an order has entered fulfillment, standard return policies and restocking fees apply if the item is eligible for return.

WEBSITE ACCURACY AND PRICING ERRORS

We make every effort to ensure product descriptions, dimensions, images, and prices are accurate. However, if a pricing error occurs, we will promptly notify affected customers. MedShop Direct reserves the right to cancel orders or modify quotes if substantial database pricing errors are discovered.

Products may vary slightly in design or color from website images due to manufacturer upgrades, modifications, or new version releases. Unless product functionality is directly impacted, refunds will not be issued for minor aesthetic variations.

All prices are subject to change without notice.

COLOR ACCURACY DISCLAIMER

Due to variations in computer monitors and display settings, color samples may appear different on various devices. We cannot guarantee that colors displayed on your screen accurately represent the actual product colors. We recommend ordering fabric samples when available for color-critical purchases. Even physical samples may have minimal variations from the finished product per manufacturer specifications.

PROTECTION PLANS

Protection Plans are non-refundable once the item has been delivered. Please carefully review Protection Plan terms and conditions before purchase.

CREDITS

Approved refunds will be issued to the original payment method.

If you paid by check or money order, refunds will be issued by check within 30 days.

QUESTIONS

If you have any questions about this policy or wish to request a return: support@medshopdirect.com 833-499-4450

POLICY UPDATES

MedShop Direct reserves the right to update this policy at any time to reflect manufacturer requirements and industry best practices. By placing an order, you acknowledge and agree to these terms.

WE PRICE MATCH

If you find a better price anywhere let us know and we will price match. Prices must include shipping. 

White Glove Delivery

White Glove Delivery requires additional time beyond our standard 4-7 business day shipping window. Once your order arrives at the specialized White Glove facility, it undergoes a 2 business day intake and processing period, after which they will contact you directly to schedule your delivery appointment. From there, please allow an additional 5-7 business days, which can occasionally extend to 8 business days depending on scheduling and logistics.

This entire process operates outside of MedShop Direct's direct control. What we do control is actively monitoring every White Glove order and escalating on your behalf if anything falls outside of the expected timeframe. We want to make sure you're taken care of every step of the way.



For Questions contact Operations@MedShopDirect.com

Bulk Orders and Tax Exemption - Call 833-499-4450

Need to purchase in Bulk? Call us to set up discounts and tax free exemptions 833-499-4450


*Excludes some Brands

WARNING - CALIFORNIA PROPOSITION 65

WARNING: Certain products sold on Medshopdirect.com, operated by OAS GLOBAL LLC, contain chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.

This warning is being provided to our customers in compliance with the California Safe Drinking Water and Toxic Enforcement Act of 1986, commonly known as Proposition 65.

Proposition 65 requires businesses to provide clear and reasonable warnings before knowingly and intentionally exposing anyone to a listed chemical. Many naturally occurring and synthetic chemicals, including those found in everyday household products, foods, drugs, and supplements, are on the Proposition 65 list.

The products we sell from manufacturers such as GF Health Products, Inc. and others may contain or expose consumers to one or more of these listed chemicals. For example, certain medical equipment, devices, or supplies may contain phthalates, lead, BPA, or other chemicals that require a warning under Proposition 65.

Why is this warning on our site?
We are providing this warning because we believe in transparently informing our customers. By law, we are required to pass on the Proposition 65 warnings provided by our suppliers. The presence of a warning does not mean that a product is in violation of any product safety standards or that the product is unsafe. The warning level is set to be highly protective, and the risk from exposure to these chemicals can be significantly lower than the warning level.

For More Information:
For more detailed information on Proposition 65, please visit the official California Office of Environmental Health Hazard Assessment (OEHHA) website at: https://oehha.ca.gov/proposition-65.

If you have specific questions about a product, please check the product's original packaging and labels, which also contain the required warning, or contact the product's manufacturer directly.

This notice serves as a general warning for products sold on Medshopdirect.com that are subject to Proposition 65 requirements. For specific concerns, please contact us.

Medshopdirect.com (OAS GLOBAL LLC)
 support@medshopdirect.com]

A front-facing three-quarter view of the Customatic Synergy Adjustable Base. The head section is partially raised, showcasing the smooth transition between the dark grey fabric upholstery and the black non-slip grip material on the surface.

Optional hi-low upgrade

Available (Twin XL and Queen)

A wide-angle view of the Customatic Synergy Adjustable Base in a split-head configuration. The dark grey upholstered frame features two independent head sections, with one side inclined for sitting and the other remaining flat. The foot section remains a single unified piece with a black metal mattress retainer bar.

Comfort & Customization

Available in Twin XL, Queen, Split Head Queen, King, and Split Head King sizes

Hi-Lo adjustable bed base upgrade with electric height adjustment, up to 8 inches of vertical lift, head and foot tilt, and hospital-style functionality for home use.

Hi-Lo Upgrade For Safer Transfers

Upgrade to a full electric hi-lo system to raise and lower the entire bed, not just the head and foot. The hi-lo lift adds up to 8" of vertical height adjustment and gentle tilt, making transfers safer for seniors and easier for caregivers at home. This is especially helpful for users with limited mobility, fall risk, or those who need a more “hospital bed” function without the hospital look.

A labeled diagram of the Customatic Synergy wireless remote showing a sleek, black oval design with specialized control buttons including comfort presets, articulation, massage features, underbed light control, and a child lock faeture.

Easy-To-Use Wireless Remote

Adjust your head and feet with a simple, backlit wireless remote designed for seniors and caregivers. Quickly move into your favorite positions for reading, watching TV, or sleeping with just a few button presses. The intuitive icons make it easy to see what each button does, even at night.

The Customatic Synergy adjustable bed frame with a split-head design. One side of the head section independently inclines to a sitting position while the other side remains flat, illustrating personalized comfort for partners.

Which Mattresses Work With the Synergy Base?

The Synergy Adjustable Base works with most modern, flexible mattresses in the matching size (Twin XL, Queen, King, or Split Head). For best comfort and performance, we recommend pairing it with compatible DreamSense mattresses designed for adjustable bases, such as select hybrid and memory foam models. Avoid very rigid, old-style spring mattresses that cannot bend easily, as they may reduce comfort and limit the range of motion.

WHITE GLOVE DELIVERY

How long will my delivery take?

Step-by-step timeline of your order

1

Order Processing

Your order is confirmed and prepared for shipment from our warehouse. For orders received before 3:00 PM Central Standard Time, processing begins the same business day.

1 – 2 business days
2

Standard Shipping

Your order leaves our warehouse and travels to the specialized White Glove facility.

3 – 5 business days
3

Intake & Processing

Your order arrives at the White Glove facility where it is inspected and prepared for final delivery.

1 – 3 business days
4

Scheduling Contact

The White Glove team will contact you directly to schedule your delivery appointment at a time that works for you.

Included in step 3
5

Scheduled Delivery

Your product is delivered with White Glove service on the agreed date. May occasionally extend to 6 business days depending on scheduling and logistics.

3 – 5 business days
Estimated total time with Standard Shipping (incl. processing) 3 – 5 business days
Estimated total time with White Glove Delivery (incl. processing) 8 – 15 business days

MedShop Direct actively monitors every order and escalates on your behalf if anything falls outside the expected timeframe. We've got you covered every step of the way.

Operations@MedShopDirect.com

What our customers say

Med shop Direct really stayed on top of our hospital bed order. We ran into some shipping challenges and they made every effort to meet the challenges. We were very pleased with the installation and follow up. Ivan communicated each day on the order and expectations. We are pleased with the product as well.

Tracy

I had an excellent experience purchasing a hospital bed for Dad with MedShop Direct from start to finish. It’s rare these days to find a company that truly prioritizes customer service, but this company absolutely does.

A special shout out to Ivan and Omar in customer service. They were outstanding. If I called and they missed it, they called me right back and even addressed me by name. That level of personal attention really stood out.

Purchasing a hospital bed can feel overwhelming, but they made the entire process smooth and stress-free. I can highly recommend MedShop Direct for anyone needing a hospital bed. Exceptional service all around!

Barbara Hendricks

Great experience from order placement through installation! I was kept informed as to the status the entire time, and everything happened exactly as scheduled. I really appreciated the ability to communicate with them through the process. Ivan was the best!!

Crissyo

Medshopdirect is a wonderful company to deal with and the product was delivered in a couple of days. I even got a email from them making sure the product was the right size before they delivered it. I ordered the mattress as 76" long because I was using it for a recliner or if she went into her bed I would put it under the sheets. I thought they really cared by sending an email to make sure the size was correct.
I would recommend them to any family or caregiver.

Sharon O.

I can't remember ever having such excellent, personalized customer service in all of my 70 years.
They don't want me to mention names but the man who helped me (O.S.) was attentive, helpful and very kind. He helped me with a specific need even after the bed was delivered and in use.
The bariatric bed is extremely well made and was delivered promptly. Everything was packed well and arrived damage free. Med Shop Direct is 1st class all the way.

Christine

Frequently Asked Questions

How does the wireless remote work? Is it easy for seniors to use?

The wireless remote has large, clear buttons and simple icons, so users can easily raise or lower the head and foot. It’s designed to be intuitive for seniors and caregivers, even in low light.

What is the Hi-Lo upgrade and who is it for?

The Hi-Lo upgrade allows you to raise and lower the entire bed vertically, not just the head and foot. This is ideal for seniors, people with mobility challenges, and caregivers who need safer, easier transfers in and out of bed.

Is there a warranty? What does it cover?

Yes, the Synergy Adjustable Bed includes:

  • 1-Year Period For All Labor
  • 2-Year Period For All Components
  • 10-Year Period for Bed Frame